RoleSchedule
Explore ProductView the complete product overview
Auto-Assign & RulesBuild coverage-aware schedules from eligibility, absences, and assignment rules.Role-Based SchedulingSchedule responsibilities and required roles instead of generic shift blocks.Eligibility & QualificationsControl who can fill specific roles before assignments are made.Scheduling Access ControlSeparate owner, admin, scheduler, and viewer access.Coverage ClaritySee open requirements and staffing gaps before publishing.
Explore Use CasesView the complete use cases overview
Team SchedulingSee how roles, locations, qualifications, preferences, and Auto-Assign work together.Security & Site OperationsPlan posts, patrols, qualifications, relief, and open coverage.Field & Service OperationsBuild qualified crews around technicians, inspectors, operators, and team leads.Continuous OperationsMaintain required capabilities across watch floors, control rooms, and multi-shift teams.Multi-Team OperationsCoordinate recurring coverage across several groups and shared responsibilities.
DemoPricing
All free scheduling toolsBrowse calculators, coverage checks, and schedule generators
24/7 Staffing CalculatorCalculate continuous-coverage headcount, relief staffing, and your current staffing gap.Staffing FeasibilityCheck whether the staff you have can cover the weekly assignment demand.Work / Rest CalculatorCompare recurring work/rest rotations against your staffing requirement.Shift Coverage CalculatorFind shortages by shift instead of relying on total headcount alone.Workforce OptimizerCompare capacity and rotation options before building a person-level schedule.
Templates
Free Scheduling TemplatesBrowse the complete Excel template library for rosters, shifts, staffing, duties, and security coverage.Free Excel Duty RosterDownload a working weekly roster with open-slot and coverage tracking.Coverage Scheduling GuideLearn when headcount stops being enough to prove the operation is covered.Scheduler ChecklistCheck requirements, qualifications, absences, work limits, and publishing before the week is final.DocumentationConfiguration and workflow guidance for teams already using RoleSchedule.
ContactLoginStart free
Product
Product OverviewAuto-Assign & RulesRole-Based SchedulingAccess ControlLive DemoPricing
Use Cases
All Use CasesTeam SchedulingSecurity & Site OperationsField & Service OperationsContinuous OperationsMulti-Team Operations
Tools
All Free Scheduling Tools24/7 Staffing CalculatorStaffing FeasibilitySchedule GeneratorWork / Rest CalculatorWorkforce Optimizer
Templates
All Scheduling TemplatesDuty Roster TemplateWeekly Employee ScheduleShift Schedule Template24/7 Staffing TemplateSecurity Guard Schedule
Resources
All ResourcesCoverage Scheduling GuideScheduler ChecklistDocumentationContact
ContactLoginStart free
Home/Free tools/Pitman Schedule Generator
Pitman / 2-2-3 rotation

Pitman Schedule Generator

Pitman schedules commonly use the same 14-day 2-2-3 work/off structure as other Panama-style rotations, often with four teams and 12-hour shifts.

All free toolsStart RoleSchedule free
Use this whenPreview the familiar Pitman 2-2-3 work/off sequence over 28 days.

No signup is required. The interactive inputs and result stay on this page.

Interactive tool

Enter your scheduling assumptions

Change the inputs and the result updates immediately. Keep the assumptions realistic—the output is only as useful as the staffing model you give it.

Result

7 work/duty days in each 14-day cycle

42 average scheduled hours / week at 12-hour shifts
Day 1WorkCycle day 1
Day 2WorkCycle day 2
Day 3OffCycle day 3
Day 4OffCycle day 4
Day 5WorkCycle day 5
Day 6WorkCycle day 6
Day 7WorkCycle day 7
Day 8OffCycle day 8
Day 9OffCycle day 9
Day 10WorkCycle day 10
Day 11WorkCycle day 11
Day 12OffCycle day 12
Day 13OffCycle day 13
Day 14OffCycle day 14
Day 15WorkCycle day 1
Day 16WorkCycle day 2
Day 17OffCycle day 3
Day 18OffCycle day 4
Day 19WorkCycle day 5
Day 20WorkCycle day 6
Day 21WorkCycle day 7
Day 22OffCycle day 8
Day 23OffCycle day 9
Day 24WorkCycle day 10
Day 25WorkCycle day 11
Day 26OffCycle day 12
Day 27OffCycle day 13
Day 28OffCycle day 14

This calendar shows the stated repeating pattern. Team phase offsets, day/night handoffs, local policy, labor rules, and qualification requirements still need to be applied for an operational schedule.

Turn the pattern into a team schedule with real constraintsSave the team, recurring requirements, eligibility, absences, work limits, and published schedule in one workspace.
Start free
How it is calculated

Method

This page models the common Pitman 2-2-3 work/off skeleton: two on, two off, three on, two off, two on, three off.

Worked example

Example

The 14-day cycle contains seven workdays. With 12-hour shifts the modeled average is 42 scheduled hours per week.

Interpret the result

What the answer means

Treat the calendar as the repeating skeleton for one team. Multi-team operations still need crew offsets, day/night assignments, handoffs, qualifications, and coverage validation.

Important limit

What this tool does not prove

Pitman implementations normally require multiple crews and a day/night phasing plan that is not represented by a single-team work/off calendar.

Use this tool to

Answer the planning question before assigning names

Generate a free Pitman shift schedule preview using a common 2-2-3 fourteen-day rotation.

01

Preview the repeating cycle across a multi-week calendar.

02

Choose a start date so the pattern maps to real dates.

03

Use the staffing calculators to confirm the rotation can support your required daily coverage.

The next layer

Capacity math cannot see every person-level scheduling constraint

A staffing model can be mathematically feasible and still fail when only certain people are qualified for a role, approved absences remove key people, assignments overlap, rest windows are too short, or coverage changes on specific dates. Those are the checks RoleSchedule keeps attached to the schedule itself.

See the workflowBuild a real week free
Related tools

Keep pressure-testing the staffing model

Browse all tools →
14-day rotating schedule

2-2-3 Schedule Generator

Preview the common 2-on, 2-off, 3-on / 2-off, 2-on, 3-off cycle over 28 days.

Open free tool →
2-2-3 Panama rotation

Panama Schedule Generator

Create a 28-day preview of the common Panama / 2-2-3 rotation.

Open free tool →
28-day rotating schedule

DuPont Schedule Generator

Preview a common four-crew DuPont sequence with days, nights, off days, and the seven-day break.

Open free tool →
Eight-day rotation

4 On 4 Off Schedule Generator

Preview a repeating four-workday, four-off-day rotation.

Open free tool →
RoleSchedule

Turn recurring staffing requirements into a schedule your team can actually follow.

Keep the roster, assignment rules, weekly planning, coverage review, and published schedule connected instead of rebuilding context across several files.

Product

Product overviewAuto-Assign & rulesRole-based schedulingAccess controlPricing

Use Cases

Team Scheduling Software for Role-Based CoverageScheduling Software for Security & Site OperationsScheduling Software for Field & Service OperationsScheduling Software for Continuous OperationsScheduling Software for Multi-Team Operations

Resources

Resource libraryFree scheduling toolsFree Excel duty rosterCoverage scheduling guideScheduler checklistSpreadsheet scheduling guideDocumentationContact

Account

Start freeLogin
© 2026 RoleScheduleroleschedule.com